Kimira Oluch smallholder farm improvement - 2021 |
|
|---|---|
|
State Department |
State Department for Regional and Northern Corridor Development |
|
Programme |
|
|
Sub Programme |
|
|
Allocation: |
KES 53,300,000.00 (D) |
Key Performance Indicators (Targets)
Key Output |
KPI |
Target Yr (2021) |
Target Yr (2022) |
Target Yr (2023) |
|---|---|---|---|---|
In-block canals and drainage |
Length (Km) of tertiary canals constructed |
8 |
4 |
- |
In-block canals and drainage |
Length in Km of In-field/collector drains constructed |
1 |
1 |
- |
In-block canals and drainage |
No of irrigation blocks connected |
7 |
4 |
- |
Farmers trained on modern farming technologies |
No. of farmers trained |
500 |
500 |
500 |
Farmers trained on operations and maintenance of irrigation infrastructure |
No. of farmers trained |
1000 |
1000 |
1000 |
Area of land under irrigated |
No. of hectares under irrigation |
414 |
236 |
- |
In-block canals and drainage
Length (Km) of tertiary canals constructed
2021
8
2022
4
2023
-
In-block canals and drainage
Length in Km of In-field/collector drains constructed
2021
1
2022
1
2023
-
In-block canals and drainage
No of irrigation blocks connected
2021
7
2022
4
2023
-
Farmers trained on modern farming technologies
No. of farmers trained
2021
500
2022
500
2023
500
Farmers trained on operations and maintenance of irrigation infrastructure
No. of farmers trained
2021
1000
2022
1000
2023
1000
Area of land under irrigated
No. of hectares under irrigation
2021
414
2022
236
2023
-
Previous Year Allocations
Num |
Year |
Total |
|---|---|---|
1 |
KES 53,300,000.00 |
User Uploads
No. of water pans, weirs and dams constructed: 50
KES 371,180,000.00
(2021)