Allocation:

71,352,898,073.00

Previous Year Allocations

Num Year Total
1 2025 KES 30,905,503,719.00
2 2024 KES 71,352,898,073.00
3 2023 KES 109,457,452,748.00
4 2022 KES 103,474,424,724.00
5 2021 KES 92,226,472,788.00

Total Allocation KES 30,905,503,719.00

Total Allocation KES 71,352,898,073.00

Total Allocation KES 109,457,452,748.00

Total Allocation KES 103,474,424,724.00

Total Allocation KES 92,226,472,788.00
Allocations by Year
Sub-Programmes

Recurrent Expenses

Num Unit Budget

Development Expenses

Num Unit Budget
1 Annuity Low Volume Seal Roads KES 14,087,000,000.00
2 Horn of Africa Gateway Development Project KES 10,415,500,000.00
3 Mombasa Mariakani Highway Project KES 5,711,542,353.00
4 Mombasa - Mtwapa KES 4,876,048,341.00
5 Low Volume Seals Phase 1 Batch 2 KES 4,405,701,465.00
6 Low Volume Seal Roads KES 3,786,567,014.00
7 Kitale-Morpus (KFW) KES 3,513,000,000.00
8 Land Compensation & Relocation of Services KES 3,500,067,024.00
9 Low Volume Seal Roads KES 3,005,015,289.00
10 Low Volume Seals Phase 1 Batch 2 KES 2,665,980,121.00
11 Low Volume Seal Roads Batch 1 KES 2,559,440,297.00
12 Low Volume Seals LVSR II KES 2,290,266,159.00
13 MPARD Package 2 - Mwache – Tsunza – Mteza KES 2,190,924,470.00
14 Low Volume Seals LVSR KES 2,166,683,164.00
15 Access Roads to Industrial Park Facilities KES 2,132,042,030.00
16 Low Volume Sealed Roads (Lvsr); Phase 1 - Batch 1A KES 2,113,609,836.00
17 Mombasa Gate Bridge (Likoni Bridge) KES 2,015,000,000.00
18 Upgrading of Elwak -Rhamu Project KES 2,000,000,000.00
19 Low Volume Seals LVSR IV KES 1,887,304,967.00
20 Low Volume Seals LVSR III KES 1,487,831,152.00
21 Isebania - Mukuyu - Kisii - Ahero Road (A1) Lot 1 & 2 KES 1,394,136,930.00
22 Consultancy Services for Roads Projects KES 1,131,329,803.00
23 Nairobi ITS Establishment & Junctions Improvement Project II KES 1,130,000,000.00
24 Establishment of Bus Rapid Transit Line 5 Project-Nairobi-BETA KES 1,055,000,000.00
25 Dualling Thika - Kenol - Marua Lot 2 (Sagana - Marua Section Section) KES 1,040,000,000.00
26 Dualling Thika - Kenol - Marua Lot 1 (Kenol- Sagana Section) KES 1,020,000,000.00
27 Eldoret Town Bypass Road KES 877,488,872.00
28 Kenya Transport Sector Support Programme KES 854,745,667.00
29 Kitale -Endebes - Suam Road KES 736,266,188.00
30 Kisumu-Miwani- Chemilil-Muhoroni Road KES 642,639,466.00
31 Barpello - Tot - Sigor - Marich Pass KES 570,000,000.00
32 Nairobi ITS Establishment & Junctions Improvement Project 1 KES 500,000,000.00
33 Construction of Ngong Road/ Naivasha Road Interchange KES 500,000,000.00
34 Access Roads to Affordable Housing Facilities KES 412,000,000.00
35 Roads10,000 Programme Phase II ( LOW VOLUME SEAL ROADS - LVSRS) KES 387,125,197.00
36 Northern Corridor Transport Improvement Project KES 339,902,558.00
37 Samatar - Wajir KES 330,000,000.00
38 National Urban Transport Improvement Project (NUTRIP) KES 320,000,000.00
39 Spot Improvement XI KES 316,408,145.00
40 Spot Improvement XV KES 302,916,705.00
41 Nyaru - Iten KES 254,000,000.00
42 Wikililye- Kathukini-Kwa Muli-Nzukini- mbumbuni KES 225,000,000.00
43 Mpard Package 3 - Mteza – Kibundani Section KES 208,923,723.00
44 Critical Roads Interventions KES 206,527,949.00
45 Dualling of Nairobi Eastern Bypass Project KES 205,384,258.00
46 Nairobi - Thika Highway Improvement Project Lot 3 KES 150,000,000.00
47 Construction of Mau Mau Road Lot 1A (Kiambu) KES 150,000,000.00
48 Construction of Mau Mau Road Lot 1B (Kiambu) KES 150,000,000.00
49 Construction of Mau Mau Road Lot 2 (Muranga) KES 150,000,000.00
50 Construction of Mau Mau Road Lot 3 ( Nyeri) KES 150,000,000.00
51 Spot Improvement Interventions KES 144,041,528.00
52 Homabay Town Roads Phase 1 KES 140,000,000.00
53 Kigumo Town Roads KES 140,000,000.00
54 Shegel - Maikona and Maikona Spur Roads and Town Roads KES 135,000,000.00
55 Ruiru – Githunguri - Uplands (C560) KES 129,000,000.00
56 South Sudan Eastern Africa Transport,Trade & Facilitation KES 126,338,729.00
57 Garissa Municipality Roads KES 115,000,000.00
58 Kibwezi - Mutomo - Kitui Road (B7) KES 110,000,000.00
59 Changamwe- Magongo - Kwa Jomvu (A109L) Road dualling KES 110,000,000.00
60 Thika - Magumu Road KES 107,364,444.00
61 Spot Improvement IX KES 105,335,188.00
62 Development of Urban Roads in Urban Five Urban Counties - Phase 1 (O KES 105,000,000.00
63 KISII BY-PASS PHASE II KES 100,000,000.00
64 Construction of Thika Town Roads KES 100,000,000.00
65 Mau Mau Lot 4: Ihithe Ndunyu Njeru KES 100,000,000.00
66 Nairobi-Nakuru- Mau Summit PPP Termination Costs KES 100,000,000.00
67 SPOT IMPROVEMENT III KES 99,311,222.00
68 Waiyaki Way - Redhill Link Road KES 90,000,000.00
69 Eu Missing Links (Eu Funded 67% & 33% GOK) KES 90,000,000.00
70 Nairobi Outering Roads KES 90,000,000.00
71 Suneka - Kiogoro By Pass, Kiogoro - Kegati By Pass, Nyakoe - Kegati KES 90,000,000.00
72 Kirinyaga Town Roads KES 90,000,000.00
73 Nuno-Modogashi Road KES 85,000,000.00
74 Marsabit - Shegel (B7) KES 85,000,000.00
75 Lungalunga- Kinango-Kwale (B92) DESIGN KES 83,042,593.00
76 Nyahururu By- Pass KES 80,000,000.00
77 Eastlands Roads Phase II KES 80,000,000.00
78 SPOT IMPROVEMENT V KES 80,000,000.00
79 CONSTRUCTION OF VALLEY/NGONG/ NYERERE Rds INTERCHANGE & U- HILL/ H-SEL KES 80,000,000.00
80 KAJIADO ACCESS ROADS KES 80,000,000.00
81 NAROK TOWN ROADS KES 80,000,000.00
82 Mlolongo - Athi river - Joska KES 80,000,000.00
83 Upgrading of Inner Core Estate Access Roads KES 80,000,000.00
84 Construction of Meru Link Roads KES 80,000,000.00
85 Tartar Junction - Kamuino KES 80,000,000.00
86 Isiolo Town Roads KES 80,000,000.00
87 Njabini - Kinyona KES 70,000,000.00
88 Dualling of Nakuru - Mau Summit Road (Land Acquisition) KES 65,000,000.00
89 Nairobi Roads Rapid De-congestion Programme (Phase II) - Annex Of Ju KES 65,000,000.00
90 Ugunja-Ukwala- Ruambwa (C92) KES 65,000,000.00
91 Construction of Garissa-Isiolo(A10) Road to Gravel Standards KES 65,000,000.00
92 Rangala-Siaya- Bondo Road KES 59,444,951.00
93 Stand Khisa- Khumsalaba Road KES 59,040,341.00
94 Dualing of Ngong Road Phase II (Adams Arcade - Ngong Town- Kiserian, KES 55,469,946.00
95 Informal Settlements Road Programme KES 55,000,000.00
96 Tarbaj Town Roads KES 50,000,000.00
97 Lomut Bridge KES 47,175,068.00
98 Marigat Bridge KES 45,000,000.00
99 Loruk - Barpelo Road KES 44,479,541.00
100 Weiwei Bridge KES 40,000,000.00
101 Endau Bridge KES 40,000,000.00
102 Garsen - Witu - Lamu Road(C112) KES 40,000,000.00
103 Nairobi Viaduct Project (Hailesellassie - Enterprise Road) KES 40,000,000.00
104 EXIM: Nairobi Western Bypass KES 40,000,000.00
105 Githurai Kimbo Phase III KES 40,000,000.00
106 Access Embu University KES 40,000,000.00
107 Chiakariga - Meru Road KES 30,000,000.00
108 Chepterit - Baraton University - Kimondi Road KES 30,000,000.00
109 North Eastern Transport Improvement Project (NETIP) KES 30,000,000.00
110 Construction of Kahawa Sukari Eastern Access Roads KES 30,000,000.00
111 KAMITI CORNER - KASARANI - MWIKI - RUAI - KANGUNDO ROADS KES 30,000,000.00
112 Upgrade of Lamu-Ijara-Garissa Road (A10) to All Weather Standard KES 30,000,000.00
113 East African Trade and Transport Facilitation Project (KRA) KES 25,903,436.00
114 Londiani-Fort Tenan-Muhoroni Road KES 23,393,584.00
115 Webuye - Malaba Road KES 20,691,477.00
116 Changamwe roundabout - Moi Int'l Airport Access Road & Port Reitz Rd KES 20,000,000.00
117 Posta (Naibor) – Kisima - Maralal KES 20,000,000.00
118 Construction of Makupa Causeway KES 20,000,000.00
119 Nairobi Southern Bypass Project KES 15,000,000.00
120 Isinya - Konza KES 15,000,000.00
121 Lamu Port Access Road KES 15,000,000.00
122 C509 Kiandongoro Forest Gate- Mutubio Forest Gate KES 15,000,000.00
123 Abardare Forest- Njoguini-kingongo- Kiganjo(B111) KES 15,000,000.00
124 Dualling of Kimwanga Malaba Section of A8 Road (20km) KES 15,000,000.00
125 Turbo Nzoia River Sikhendu Endebess (C44) Road Project. KES 15,000,000.00
126 Biretwo Arror - Chesongoch (B126) Road (85km) KES 15,000,000.00
127 Upgrading of Jnct A8 Ngeria-Jnct C618 Plateau (C642) Road KES 15,000,000.00
128 Lesseru - Kitale KES 15,000,000.00
129 Morpus - Kainuk KES 15,000,000.00
130 Kainuk - Lokichar KES 15,000,000.00
131 Oljororok - Ndundori Road KES 14,552,740.00
132 Nairobi - Thika Highway Improvement Project Lot 1 & 2 KES 14,321,448.00
133 Ngong Road - Kibera - Kungukarumba - Langata Road (Missing Link No. KES 12,298,711.00
134 Chebilat - Ikonge - Chabera Road KES 12,000,000.00
135 Ngong Road Footbridges (KNH, Daystar & Prestige) KES 12,000,000.00
136 Annuity Programme Lot 15: Central and Eastern Region Projects KES 12,000,000.00
137 GwA Kungu- Junct 463-Mutara- Nyanyuki(B22) KES 10,000,000.00
138 Annuity Programme Lot 18: Western Region Projects KES 10,000,000.00
139 Modika - Nuno Road (phase II) KES 7,960,735.00
140 Thika Bypass KES 7,000,000.00
141 Mau Narok - Kisiriri (B18) KES 5,766,541.00
142 Mombasa Port Area Roads Development project KES 5,000,000.00
143 Transport Infrastructure for Regional Integration (Merille River-Mars KES 5,000,000.00
144 Kehancha-Suna - Masara Road KES 5,000,000.00
145 Narok - Sekenani Road (C12) - Design KES 5,000,000.00
146 Emali- Oloitoktok Road KES 5,000,000.00
147 Ngong Road - Naivasha Road - A104 (dualling)- Design KES 5,000,000.00
148 Rehabilitation/ Dualling Of Argwings Kodhek Road KES 5,000,000.00
149 Nairobi Eastern Interchanges (Landhies - Jogoo Road Corridor) KES 5,000,000.00
150 ATHI RIVER - ONGATA RONGAI -MATASIA -NGONG LINK KES 5,000,000.00
151 Steel Bridges phase II(Tmall Flyover &Bridges on Msa&Langata Roads) KES 5,000,000.00
152 Nakuru North. Bypass Nyahururu B5 - Kabarak (B4) - A104 - Njoro (C56) KES 5,000,000.00
153 Construction of Acacia Road- Kitengela Bypass -Phase 1 KES 5,000,000.00
154 Dualling of Ngong Phase IV-Karen Junction-Ngong Town KES 5,000,000.00
155 Dualling of Limuru Road Phase 1 KES 5,000,000.00
156 Construction of Ngong Road/ Naivasha Road Interchange KES 5,000,000.00
157 Nairobi Roads Rapid Decongestion -Lot 15 KES 5,000,000.00
158 James Gchuru Road (ABC Place - Junction Mall) KES 5,000,000.00
159 Rumuruti - Mararal Road (phase I) KES 4,581,683.00
160 Kenya/ Ethiopia, Isiolo-Moyale Road Project Phase II (Masarbit-Turbi) KES 3,000,000.00
161 Kisii - Chemosit Road(C21) KES 2,713,596.00
162 Kahawa West Fly Over Bridge And Adjoining Accesses KES 2,695,545.00
163 Bomas - Ongata Rongai - Kiserian Road Dualling - Design KES 2,000,000.00
164 Rodi Kopany - Ndhiwa - Karungu Road KES 1,448,128.00
165 Kericho By-Pass KES 1,329,746.00

Development Budget KES 14,087,000,000.00

Development Budget KES 10,415,500,000.00

Development Budget KES 5,711,542,353.00

Development Budget KES 4,876,048,341.00

Development Budget KES 4,405,701,465.00

Development Budget KES 3,786,567,014.00

Development Budget KES 3,513,000,000.00

Development Budget KES 3,500,067,024.00

Development Budget KES 3,005,015,289.00

Development Budget KES 2,665,980,121.00

Development Budget KES 2,559,440,297.00

Development Budget KES 2,290,266,159.00

Development Budget KES 2,190,924,470.00

Development Budget KES 2,166,683,164.00

Development Budget KES 2,132,042,030.00

Development Budget KES 2,113,609,836.00

Development Budget KES 2,015,000,000.00

Development Budget KES 2,000,000,000.00

Development Budget KES 1,887,304,967.00

Development Budget KES 1,487,831,152.00

Development Budget KES 1,394,136,930.00

Development Budget KES 1,131,329,803.00

Development Budget KES 1,130,000,000.00

Development Budget KES 1,055,000,000.00

Development Budget KES 1,020,000,000.00

Development Budget KES 877,488,872.00

Development Budget KES 854,745,667.00

Development Budget KES 736,266,188.00

Development Budget KES 642,639,466.00

Development Budget KES 570,000,000.00

Development Budget KES 500,000,000.00

Development Budget KES 500,000,000.00

Development Budget KES 412,000,000.00

Development Budget KES 339,902,558.00

Development Budget KES 330,000,000.00

Development Budget KES 320,000,000.00

Development Budget KES 316,408,145.00

Development Budget KES 302,916,705.00

Development Budget KES 254,000,000.00

Development Budget KES 225,000,000.00

Development Budget KES 208,923,723.00

Development Budget KES 206,527,949.00

Development Budget KES 205,384,258.00

Development Budget KES 150,000,000.00

Development Budget KES 150,000,000.00

Development Budget KES 150,000,000.00

Development Budget KES 150,000,000.00

Development Budget KES 150,000,000.00

Development Budget KES 144,041,528.00

Development Budget KES 140,000,000.00

Development Budget KES 140,000,000.00

Development Budget KES 135,000,000.00

Development Budget KES 129,000,000.00

Development Budget KES 126,338,729.00

Development Budget KES 115,000,000.00

Development Budget KES 110,000,000.00

Development Budget KES 110,000,000.00

Development Budget KES 107,364,444.00

Development Budget KES 105,335,188.00

Development Budget KES 100,000,000.00

Development Budget KES 100,000,000.00

Development Budget KES 100,000,000.00

Development Budget KES 100,000,000.00

Development Budget KES 99,311,222.00

Development Budget KES 90,000,000.00

Development Budget KES 90,000,000.00

Development Budget KES 90,000,000.00

Development Budget KES 90,000,000.00

Development Budget KES 85,000,000.00

Development Budget KES 85,000,000.00

Development Budget KES 83,042,593.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 80,000,000.00

Development Budget KES 70,000,000.00

Development Budget KES 65,000,000.00

Development Budget KES 65,000,000.00

Development Budget KES 59,444,951.00

Development Budget KES 59,040,341.00

Development Budget KES 55,000,000.00

Development Budget KES 50,000,000.00

Development Budget KES 47,175,068.00

Development Budget KES 45,000,000.00

Development Budget KES 44,479,541.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 40,000,000.00

Development Budget KES 30,000,000.00

Development Budget KES 30,000,000.00

Development Budget KES 30,000,000.00

Development Budget KES 30,000,000.00

Development Budget KES 30,000,000.00

Development Budget KES 25,903,436.00

Development Budget KES 23,393,584.00

Development Budget KES 20,691,477.00

Development Budget KES 20,000,000.00

Development Budget KES 20,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 15,000,000.00

Development Budget KES 14,552,740.00

Development Budget KES 14,321,448.00

Development Budget KES 12,000,000.00

Development Budget KES 12,000,000.00

Development Budget KES 12,000,000.00

Development Budget KES 10,000,000.00

Development Budget KES 10,000,000.00

Development Budget KES 7,960,735.00

Development Budget KES 7,000,000.00

Development Budget KES 5,766,541.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 5,000,000.00

Development Budget KES 4,581,683.00

Development Budget KES 2,713,596.00

Development Budget KES 2,695,545.00

Development Budget KES 2,000,000.00

Development Budget KES 1,448,128.00

Development Budget KES 1,329,746.00